Building road: hauling debris, etc.



Building road: hauling debris, etc.:


Processes during earthwork include excavation, removal of material to spoil, filling, compacting, construction and trimming. If rock or other unsuitable material is discovered it is removed, moisture content is managed and replaced with standard fill compacted to 90% relative compaction. Generally blasting of rock is discouraged in the road bed. When a depression must be filled to come up to the road grade the native bed is compacted after the topsoil has been removed. The fill is made by the "compacted layer method" where a layer of fill is spread then compacted to specifications, the process is repeated until the desired grade is reached.

Building road: hauling debris, etc.

This activity burns approximately
522 calories per hour for an average, 145-pound person.


We calculate the calories you burn through exercise
based on your weight of lbs. (Update your weight.)

I did this!




TDP members who have logged Building road: hauling debris, etc.:

Date:

For how many minutes?

Optional:
Distance:        Heart rate: